MIL-PRF-49320A(CR)
Subgroups 2, 3 and 4 shall be performed. A minimum of: Six (6) units shall be assigned to
Subgroup 2, Three (3) units assigned to Subgroup 3, and Six (6) units assigned to Subgroup 4
(reliability). For the inspections of Subgroup 2 only three (3) units are required to be subjected to,
Temperature Shock, Vibration, Shock and Immersion in this order. For the inspections of
Subgroup 3 marked (X91) only one unit is required to be subjected to any one test. Except for
these specific sequences, all other tests may be performed in any order.
12
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business